AMEP 113
This module covers the installations and operations of aircraft engines.
Hours:
- Total Hours: 72
-
Shop/Teaching Kitchen: 72
Total Weeks: 15
This course is offered online: No
Prerequisite:
Admission to the Aircraft Maintenance Engineering Program.
Course Content:
P13-1 Piston Engine Change
-
Remove engine from airframe and replace with serviceable engine
-
Ground run aircraft
P13-2 Turbine Engine Change
-
Remove engine from airframe and replace with serviceable engine
-
Ground run aircraft
P13-3 Commander Run-up
-
Complete ground testing of aircraft to manufacturer's guidelines
Learning Outcomes:
- The student will install and ground run a piston and turbine engine in an aircraft.
Grading System: Percentage
Passing Grade: 70%
Percentage of Group Work: 100
Course Offered in Other Programs: No
Additional Comments:
- P13-1=45%
- P13-2=50%
- P13-3=5%
Textbooks: Textbooks are subject to change. Please contact the bookstore at your local campus for current book lists.